At the end of the tunnel! Its visible! The kitchen project that never ends is nearly over. The "TO DO" list would fit on one hand these days. I have a secret plan to be finished with ALL of it over the Thanksgiving holiday. That will be appropriate because we kicked off this project with a trip to the fancy lumber store over the Thanksgiving holiday in 2008. The remaining items:

1) Make a kick board for the peninsula.
2) Make a little spacer block for the crown molding. (5 min tops)
3) Route out the glass doors and assemble them.
4) Order the glass.
5) Trim, route, and assemble the remaining frames for drawer fronts.
6) Stain items 1,2,3, and 5.
7) Attach spacers to drawer fronts.
8) Install all that stuff.
9) A little caulk maybe.

Okay two hands.





Thursday, November 4, 2010

The New Addition

0 comments
He's here folks! I think he likes the house pretty well.


In fact, he's six weeks old now. Since his arrival, we have gotten *a little* bit of work done on the kitchen. All the doors are hung and operational now. All that's left is the drawer fronts. Anybody know where to get a 20mm forstner bit that doesn't cost $40?